3.1. Overview Rollout Agenda
3.2. Present BTD Supplier Rollout Presentation
· Demand/Production
Graphs
· Machine Logs
· Part Tagging Sheet
· Reinforce the need
for direct operator recording for both tagging sheets
3.3. Conduct Factory Tour
· Follow components
through entire process
· Determine how and
where inventory(Raw, WIP, Finished) is handled
· Determine whether
the Part Tag Sheets should follow job paperwork or the physical containers.
3.4. Review Part Selection—see section 4
3.5. Review Data Collection—see section 5
3.6. Identify Critical Equipment
· Study from manufacturing
routings
3.6.1. Multiple equipment for one operation
· Similar—need to
tag all
· Manufacturing Cell—need
only one if cell operates as one unit
3.6.2. Outside Vendors/Operations
· Coordinate with
shipping/receiving department to track material departure and return
3.6.3. Other Buildings
3.7. Arrange Followup Visit(s)
BTD Methodology
Pre Study | Study Prep | Roll Out | Part Selection | Data Collection | Utilization | Analysis
Build to Demand Homepage | Process Mapping Homepage | Online Process MappingLast Modified on: 14-Dec-2001
Please forward your comments to Here
Copyright © Production Control Charting
All Rights ReservedPage Design, Creation & Graphics © 2001 GCA
All Rights Reserved. Do not copy or redistribute in any form.